Question Details

(Solved) Case Problem 1, "Quality Associates, Inc." Quality


?Case Problem 1, ?Quality Associates, Inc.?

Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client gave Quality Associates a sample of 800 observations taken during a time in which that client?s process was operating satisfactorily. The sample standard deviation for these data was .21; hence, with so much data, the population standard deviation was assumed to be .21. Quality Associates then suggested that random samples of size 30 be taken periodically to monitor the process on an ongoing basis. By analyzing the new samples, the client could quickly learn whether the process was operating satisfactorily. When the process was not operating satisfactorily, corrective action could be taken to eliminate the problem. The design specification indicated the mean for the process should be 12. The hypothesis test suggested by Quality Associates follows. H0: ? = 12 Ha: ? ? 12 Corrective action will be taken any time H0 is rejected.

The following samples were collected at hourly intervals during the first day of operation of the new statistical process control procedure. These data are available in the data set Quality.

Sample 1 Sample 2 Sample 3 Sample 4

11.55 11.62 11.91 12.02

11.62 11.69 11.36 12.02

11.52 11.59 11.75 12.05

11.75 11.82 11.95 12.18

11.90 11.97 12.14 12.11

11.64 11.71 11.72 12.07

11.80 11.87 11.61 12.05

12.03 12.10 11.85 11.64

11.94 12.01 12.16 12.39

11.92 11.99 11.91 11.65

12.13 12.20 12.12 12.11

12.09 12.16 11.61 11.90

11.93 12.00 12.21 12.22

12.21 12.28 11.56 11.88

12.32 12.39 11.95 12.03

11.93 12.00 12.01 12.35

11.85 11.92 12.06 12.09

11.76 11.83 11.76 11.77

12.16 12.23 11.82 12.20

11.77 11.84 12.12 11.79

12.00 12.07 11.60 12.30

12.04 12.11 11.95 12.29

11.98 12.05 11.96 12.29

12.30 12.37 12.22 12.47

12.18 12.25 11.75 12.03

11.97 12.04 11.96 12.17

12.17 12.24 11.95 11.94

11.85 11.92 11.89 11.97

12.30 12.37 11.88 12.23

12.15 12.22 11.93 12.25

WEB file Quality The following samples were collected at hourly intervals during the first day of operation of the new statistical process control procedure. These data are available in the data set Quality.

Managerial Report

1. Conduct a hypothesis test for each sample at the .01 level of significance and determine what action, if any, should be taken. Provide the test statistic and p-value for each test.

2. Compute the standard deviation for each of the four samples. Does the assumption of .21 for the population standard deviation appear reasonable?

3. Compute limits for the sample mean x ? around ? = 12 such that, as long as a new sample mean is within those limits, the process will be considered to be operating satisfactorily. If x ? exceeds the upper limit or if x ? is below the lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality control purposes.

4. Discuss the implications of changing the level of significance to a larger value. What mistake or error could increase if the level of significance is increased?


 


Solution details:

Pay using PayPal (No PayPal account Required) or your credit card . All your purchases are securely protected by .
SiteLock

About this Question

STATUS

Answered

QUALITY

Approved

DATE ANSWERED

Oct 15, 2019

EXPERT

Tutor

ANSWER RATING

YES, THIS IS LEGAL

We have top-notch tutors who can do your essay/homework for you at a reasonable cost and then you can simply use that essay as a template to build your own arguments.

You can also use these solutions:

  • As a reference for in-depth understanding of the subject.
  • As a source of ideas / reasoning for your own research (if properly referenced)
  • For editing and paraphrasing (check your institution's definition of plagiarism and recommended paraphrase).
This we believe is a better way of understanding a problem and makes use of the efficiency of time of the student.

NEW ASSIGNMENT HELP?

Order New Solution. Quick Turnaround

Click on the button below in order to Order for a New, Original and High-Quality Essay Solutions. New orders are original solutions and precise to your writing instruction requirements. Place a New Order using the button below.

WE GUARANTEE, THAT YOUR PAPER WILL BE WRITTEN FROM SCRATCH AND WITHIN A DEADLINE.

Order Now